This may be as simple as an attack hydrant requirement such as a dual hydrant riser or a more complicated fire brigade quad booster point complete with feed hydrants isolating and check valves.
Fire hydrant booster assembly requirements.
The site needs to have appropriate parking space available for the fire appliances to park whilst within reach of the fire hydrant booster system.
Assess the site for the safety and logistical requirements to carry out the test.
Please nominate connections lh or rh entry either butterfly or gate valves required to suit relevant authority requirements.
Flow requirements qfes expect that the flow and pressure of the street hydrant is tested to ensure compliance with australian standard as 2419 1 2005 table 2 1 and shall be capable of discharging no less than.
Determine if road closure or traffic diversion is required.
Fire hydrant system commissioning tests do not satisfy the test requirements for fire brigade booster connection compliance as required by as 2419 3 2012.
Fire australia co pty ltd offers broad range of fire hydrant risers fire hydrant fittings fire hydrant valves fire hydrant risers pipe fire hose reels hydrant boosters fire cabinets of best quality.
Fire brigade booster assembly installed external attack hydrant pressure and flow requirements apply additional pressure and flow capacity when boosted internal attack hydrant pressure and flow different requirements as 2419 1 public comment draft.
Fire brigade test pressure is 1700kpa all booster units can be supplied as individual components or fully part assembled.
Fire hydrant flows and pressures for different fire compartments on one hydrant system qfes interpret that when a fire hydrant system is required by the national construction code ncc volume one clause e1 3 for a fire compartment contained within the same building as another fire compartment also with a required fire hydrant system and each fire compartment having different flows and.
7 6 when the fire brigade booster connection is installed the completed fire hydrant system is to be tested and commissioned in accordance with section 10 of as 2419 1 2005.
Booster and hydrant assemblies consist of arrangements of valves pipe work to suit specific site fire protection needs.
Hazardous chemicals manifest pdf fire brigade booster connection with inlet insert pdf fire hydrant concessions for existing buildings pdf.
Fire hydrants for minor residential development pdf fire safety in waste facilitites pdf guidelines for bulk storage of rubber tyres pdf impulse fans in car parks pdf technical information sheets.
Ensure adequate parking for fire appliances.
The booster assembly provides a point of attachment for the fire brigade to provide additional water to a fire hydrant system in the event of an emergency.